FIDVR Meetings and Workshops

Project Status: 
Current

In 2007, the utility industry approached DOE to discuss growing concerns they had regarding the potential impacts of FIDVR on grid reliability. DOE has co-sponsored three national workshops (in 2008, 2009, and 2015) with NERC to vet the topic with both the utility and air-conditioner manufacturing industries. These workshops are the precursor to the current DOE research initiative with industry on FIDVR.

Related Publications

"Composite Load Modeling & System Studies.". 2015 Workshop on Fault-Induced Delayed Voltage Recovery (FIDVR) & Dynamic Load Modeling 2015.
"Current State of Load Modeling: Composite Load Model Development and Implementation.". 2015 Workshop on Fault-Induced Delayed Voltage Recovery (FIDVR) & Dynamic Load Modeling 2015.
"Field Measurements.". 2015 Workshop on Fault-Induced Delayed Voltage Recovery (FIDVR) & Dynamic Load Modeling 2015.
"Fundamentals, Testing and Modeling of Air Conditioners.". 2015 Workshop on Fault-Induced Delayed Voltage Recovery (FIDVR) & Dynamic Load Modeling 2015.
"Load Model Data.". 2015 Workshop on Fault-Induced Delayed Voltage Recovery (FIDVR) & Dynamic Load Modeling 2015.
"Manufacturing Perspective, Future Trends & Technologies.". 2015 Workshop on Fault-Induced Delayed Voltage Recovery (FIDVR) & Dynamic Load Modeling 2015.
"Reliability Focus.". 2015 Workshop on Fault-Induced Delayed Voltage Recovery (FIDVR) & Dynamic Load Modeling 2015.