Publications
"Overview of the CERTS microgid laboratory test bed." Integration of Wide-Scale Renewable Resources into the Power Delivery System, CIGRE/IEEE PES Joint Symposium. Calgary, AB, Canada: IEEE, 2009.
. "Power System Risk Assessment and Control in a Multiobjective Framework." IEEE Transactions on Power Systems 24.1 (2009) 78 - 85.
. "The problem of initiating controlled islanding of a large interconnected power system solved as a Pareto optimization." 2009 IEEE/PES Power Systems Conference and Exposition (PSCE). Seattle, WA, USA: IEEE, 2009. 1 - 7.
. . "Risk-based optimal power flow and system operation state." IEEE Power & Energy Society (PES) General Meeting. Calgary, Canada: IEEE, 2009. 1 - 6.
. "Synchronized sampling uses for real-time monitoring and control." 2009 North American Power Symposium (NAPS). Starkville, MS, USA: IEEE, 2009. 1 - 6.
. . "Is teamwork the smart solution?." IEEE Power and Energy Magazine 7.2 (2009).
. A Technical Reference Paper Fault-Induced Delayed Voltage Recovery. Princeton, NJ: North American Electric Reliability Corporation, 2009.
. Transmission Benefit Quantification, Cost Allocation and Cost Recovery. Berkeley: LBNL, 2009.
. "Two-level PMU-based linear state estimator." 2009 IEEE/PES Power Systems Conference and Exposition (PSCE). Seattle, WA, USA: IEEE, 2009. 1 - 6.
. Using Air Conditioning Load Response for Spinning Reserve. Oak Ridge: Oak Ridge National Laboratory, 2009.
. WECC Air Conditioner Motor Model Test Report. Western Electricity Coordinating Council, 2009.
. "Wide-area dynamic security region." 2009 North American Power Symposium (NAPS). Starkville, MS, USA: IEEE, 2009. 1 - 6.
. . 2008.
"An advanced security constrained OPF that produces correct market-based pricing." 2008 IEEE Power and Energy Society General Meeting. Pittsburgh, PA, USA: IEEE, 2008. 1 - 6.
. Air Conditioner Compressor Performance Model. Richland, WA: Pacific Northwest National Laboratory, 2008.
. Assessing the Value of Regulation Resources Based on Their Time Response Characteristics. Richland: Pacific Northwest National Laboratory, 2008.
. California ISO Phasor Application Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix D). Berkeley: LBNL, 2008.
. . California ISO Real Time Voltage Security Assessment (VSA) Prototype Functional Specifications/Prototype Development (Real-Time Grid Reliability Management PIER Final Project Report Appendix C). Berkeley: LBNL, 2008.
. California ISO Real Time Voltage Security Assessment (VSA) Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix B). Berkeley: LBNL, 2008.
. "Coupling Wind Generators with Deferrable Loads." 2008 IEEE Energy 2030 Conference (Energy). Atlanta, GA, USA: IEEE, 2008. 1 - 7.
. "Design of Wide-Area Damping Controllers for Interarea Oscillations." IEEE Transactions on Power Systems 23.3 (2008) 1136 - 1143.
. "Efficient and Reliable Reactive Power Supply and Consumption - Insights from an Integrated Program of Engineering and Economics Research." The Electricity Journal 2008: 70–81. LBNL-63782.
.