Transmission Benefit Quantification, Cost Allocation and Cost Recovery. Berkeley: LBNL, 2009.
. California ISO Phasor Application Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix D). Berkeley: LBNL, 2008.
. . California ISO Real Time Voltage Security Assessment (VSA) Prototype Functional Specifications/Prototype Development (Real-Time Grid Reliability Management PIER Final Project Report Appendix C). Berkeley: LBNL, 2008.
. California ISO Real Time Voltage Security Assessment (VSA) Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix B). Berkeley: LBNL, 2008.
. "Efficient and Reliable Reactive Power Supply and Consumption - Insights from an Integrated Program of Engineering and Economics Research." The Electricity Journal 2008: 70–81. LBNL-63782.
. Prototype Phasor-Based Real-Time Monitoring Software Tool - Training Presentation (Real-Time Grid Reliability Management PIER Final Project Report Appendix E). Berkeley: LBNL, 2008.
. Prototype Phasor-Based Real-Time Monitoring Software Tool - User Guide (Real-Time Grid Reliability Management PIER Final Project Report Appendix F). Berkeley: LBNL, 2008.
. Real Time Systems Operations 2006 - 2007. Berkeley: LBNL, 2008. LBNL-895E .
. Real-Time Grid Reliability Management (2008): PIER Final Project Report. Berkeley: LBNL, 2008.
. Real-Time Tools Survey Analysis and Recommendations, Final Report. Berkeley: The North American Electric Reliability Corporation , 2008.
. . . . Demand Response Spinning Reserve Demonstration. Berkeley: LBNL, 2007. LBNL-62761.
. Real Time Grid Reliability Management 2005: PIER Final Project Report. Berkeley: LBNL, 2007. LBNL-62368 .
. "Reliability Monitoring: The High-Tech Eye in the Sky." Public Utilities Fortnightly 2007. LBNL-62494 .
. Maintain, Enhance, and Improve Reliability of California’s Electric System under Restructuring. Berekeley: LBNL, 2006. LBNL-58939.
. Berkeley: U.S Department of Energy, 2006.
U.S.-Canada Power System Outage Task Force, 2006.
"Toward More Comprehensive Assessments of FERC Electricity Restructuring Policies: A Review of Recent Benefit-Cost Studies of RTOs." The Electricity Journal 2006: 50-62. LBNL-62571.
. "Validation of the CERTS Microgrid Concept: The CEC/CERTS Microgrid Testbed." IEEE Power and Energy Society General Meeting. Montreal, Canada, 2006. 3. LBNL-60326.
. .
A Review of Recent RTO Benefit-Cost Studies: Toward More Comprehensive Assessments of FERC Electricity Restructuring Policies. 2005. LBNL-58027.
. . 2005.