Publications

Export 15 results:
Author Title [ Type(Desc)] Year
Filters: First Letter Of Title is B  [Clear All Filters]
Conference Paper
Lamadrid, Alberto J, Timothy D Mount, Wooyoung Jeon, and Hao Lu. "Barriers to Increasing the Role of Demand Resources in Electricity Markets." 2014 47th Hawaii International Conference on System Sciences (HICSS). Waikoloa, HI: IEEE, 2014. 2314 - 2324.
Amidan, Brett G, Jim Follum, K.A. Freeman, and Jeffery E Dagle. "Baselining PMU Data to Find Patterns and Anomalies." CIGRE 2015 Grid of the Future Symposium. Paris, France: CIGRE, 2015.
Carreras, Benjamin A, V.E. Lynch, David E Newman, and Ian Dobson. "Blackout mitigation assessment in power transmission systems." 36th Annual Hawaii International Conference on System Sciences (HICSS). Big Island, HI, USA: IEEE, 2003. 10 pp.
Louca, Raphael, Subhonmesh Bose, and Eilyan Bitar. "A bound on the minimum rank of solutions to sparse linear matrix equations." 2016 American Control Conference (ACC). Boston, MA, USA: IEEE, 2016. 6501 - 6506.
Ma, J, Ruisheng Diao, Yuri V Makarov, Pavel V Etingov, Ning Zhou, and Jeffery E Dagle. "Building decision trees for characteristic ellipsoid method to monitor power system transient behaviors." IEEE Power and Energy Society (PES) General Meeting. Minneapolis, MN: IEEE, 2010. 1 - 8.
Wang, Zhifang, and Robert J Thomas. "On Bus Type Assignments in Random Topology Power Grid Models." 48th Hawaii International Conference on System Sciences (HICSS). Kauai, HI: IEEE, 2015.
Report
Xue, Song, Ajay Das, and Bharat Bhargava. Baselining Study with a Focus on Eastern Interconnection: Interim Report for Event Precursor Study. Electric Power Group, 2016.
Yinger, Robert J. Behavior of Capstone and Honeywell Microturbine Generators During Load Changes. Rosemead: CERTS, 2001. LBNL-49095.
Yinger, Robert J. Behavior of Two Capstone 30kW Microturbines Operating in Parallel with Impedance Between Them. CERTS, 2004. LBNL-55907.
Martin, Kenneth, Prashant Palayam, Iknoor Singh, Chen Sun, and Xuanyu Wang. Best Practice Recommendations for Synchrophasor Systems: Administration, Planning and Implementation, and Operation and Maintenance. Electric Power Group, 2013.
Eto, Joseph H. Building Electric Transmission Lines: A Review of Recent Regional Transmission Plans. 2016. LBNL-1006331.
Eto, Joseph H. Building Electric Transmission Lines: A Review of Recent Transmission Projects. 2016. LBNL-1006330.
Firestone, Ryan M, Charles Creighton, Owen C Bailey, Chris Marnay, and Michael Stadler. A Business Case for On-Site Generation: The BD Biosciences Pharmingen Project. Berkeley: Lawrence Berkeley National Laboratory, 2003. LBNL-52759.