Publications
Workshop on Electric Transmission Reliability: DOE/CERTS Workshop Report and White Papers. Berkeley: LBNL, 1999.
. . Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation. 2010. LBNL-4142E.
. Understanding the Cost of Power Interruptions to U.S. Electricity Consumers. Berkeley: LBNL, 2004. LBNL-55718.
. Transmission-Planning Research and Development Scoping Project. 2004. LBNL-55487.
. Transmission Benefit Quantification, Cost Allocation and Cost Recovery. Berkeley: LBNL, 2009.
. Tracking the Reliability of the U.S. Electric Power System: An Assessment of Publicly Available Information Reported to State Public Utility Commissions. Berkeley: LBNL, 2008. LBNL-1092E.
. . Scoping Study Report on Improving Load and Generator Response Models (Real-Time Grid Reliability Management PIER Final Project Report Appendix G). Berkeley: LBNL, 2008.
. Scoping Study on Trends in the Economic Value of Electricity Reliability to the U.S. Economy. 2001. LBNL-47911.
. Scoping Study on Research and Priorities for Distribution-System Phasor Measurement Units. Lawrence Berkeley National Laboratory, 2015. LBNL-1003915.
. A Review of Recent RTO Benefit-Cost Studies: Toward More Comprehensive Assessments of FERC Electricity Restructuring Policies. 2005. LBNL-58027.
. . . Regional Transmission Planning: A Review of Practices Following FERC Order Nos. 890 and 1000. 2017. LBNL-2001079.
. U.S.-Canada Power System Outage Task Force, 2006.
Real-Time Tools Survey Analysis and Recommendations, Final Report. Berkeley: The North American Electric Reliability Corporation , 2008.
. Real-Time Grid Reliability Management (2008): PIER Final Project Report. Berkeley: LBNL, 2008.
. Real Time Systems Operations 2006 - 2007. Berkeley: LBNL, 2008. LBNL-895E .
. Real Time Grid Reliability Management 2005: PIER Final Project Report. Berkeley: LBNL, 2007. LBNL-62368 .
. Prototype Phasor-Based Real-Time Monitoring Software Tool - User Guide (Real-Time Grid Reliability Management PIER Final Project Report Appendix F). Berkeley: LBNL, 2008.
. Prototype Phasor-Based Real-Time Monitoring Software Tool - Training Presentation (Real-Time Grid Reliability Management PIER Final Project Report Appendix E). Berkeley: LBNL, 2008.
. The Potential Impacts of a Competitive Wholesale Market in the Midwest: A Preliminary Examination of Centralized Dispatch. 2004. LBNL-56503.
. . .