Publications

Export 813 results:
Author Title [ Type(Desc)] Year
Filters: 10.1016 is j.energy.2006.02.008  [Clear All Filters]
Report
Chassin, David, Y. Zhang, Pavel V Etingov, D. James, DI Hatley, Harold Kirkham, John D Kueck, X. Li, Y. Huang, and C. Chen. ARRA Interconnection Planning - Load Modeling Activities. Pacific Northwest National Laboratory, 2015.
Larsen, Peter H, Kristina Hamachi LaCommare, Joseph H Eto, and James L Sweeney. Assessing Changes in the Reliability of the U.S. Electric Power System. 2015. LBNL-188741.
Makarov, Yuri V, Jian Ma, Shuai Lu, and Tony B Nguyen. Assessing the Value of Regulation Resources Based on Their Time Response Characteristics. Richland: Pacific Northwest National Laboratory, 2008.
Assessment of Historical Transmission Congestion in the Eastern Interconnection for 2015 (v2.0). Open Access Technology International, 2019.
International, Open Access Tec. Assessment of Historical Transmission Schedules and Flows in the Eastern Interconnection, v1.0. Open Access Technology International, 2015.
International, Open Access Tec. Assessment of Historical Transmission Schedules and Flows in the Eastern Interconnection. Open Access Technology International, 2014.
Group, Electric Power, and Consortium for Electr Solutions. Assessment of Reliability and Operational Issues for Integration of Renewable Generation. 2005.
Kezunovic, Mladen, Maja Knezev, and Zarko Djekic. Automated Circuit Breaker Monitoring. 2007.
Donnelly, Matthew K, S. Mattix, Dan Trudnowski, and Jeffery E Dagle. Autonomous Demand Response for Primary Frequency Regulation. Pacific Northwest National Laboratory, 2012.
Xue, Song, Ajay Das, and Bharat Bhargava. Baselining Study with a Focus on Eastern Interconnection: Interim Report for Event Precursor Study. Electric Power Group, 2016.
Yinger, Robert J. Behavior of Capstone and Honeywell Microturbine Generators During Load Changes. Rosemead: CERTS, 2001. LBNL-49095.
Yinger, Robert J. Behavior of Two Capstone 30kW Microturbines Operating in Parallel with Impedance Between Them. CERTS, 2004. LBNL-55907.
Martin, Kenneth, Prashant Palayam, Iknoor Singh, Chen Sun, and Xuanyu Wang. Best Practice Recommendations for Synchrophasor Systems: Administration, Planning and Implementation, and Operation and Maintenance. Electric Power Group, 2013.
Eto, Joseph H. Building Electric Transmission Lines: A Review of Recent Regional Transmission Plans. 2016. LBNL-1006331.
Eto, Joseph H. Building Electric Transmission Lines: A Review of Recent Transmission Projects. 2016. LBNL-1006330.
Firestone, Ryan M, Charles Creighton, Owen C Bailey, Chris Marnay, and Michael Stadler. A Business Case for On-Site Generation: The BD Biosciences Pharmingen Project. Berkeley: Lawrence Berkeley National Laboratory, 2003. LBNL-52759.
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis. CA ISO Real Time Voltage Security Assessment (VSA) Project: Summary of Survey Result on Methodologies for use in Real Time Voltage Security Assessment. 2005.
Solutions, Consortium for Electr. CAISO-CERTS Synchronized Phasor Measurements Applications User Guide. 2002.
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis. California ISO Phasor Application Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix D). Berkeley: LBNL, 2008.
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis. California ISO Real Time Voltage Security Assessment (VSA) Project: Summary of Survey Results on Methodologies for use in Real-Time Voltage Security Assessment (Real-Time Grid Reliability Management PIER Final Project Report Appendix A). Berkeley: LBNL, 2008.
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis. California ISO Real Time Voltage Security Assessment (VSA) Prototype Functional Specifications/Prototype Development (Real-Time Grid Reliability Management PIER Final Project Report Appendix C). Berkeley: LBNL, 2008.
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis. California ISO Real Time Voltage Security Assessment (VSA) Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix B). Berkeley: LBNL, 2008.
Budhraja, Vikram S, Fred Mobasheri, Margaret Cheng, Jim Dyer, Eduyng Castaño, and Stephen Hess. California’s Electricity Generation and Transmission Interconnection Needs Under Alternative Scenarios. CERTS, 2003.
Eto, Joseph H, and John P Stovall. California's Electricity System of the Future: Scenario Analysis in Support of Public-Interest Transmission System R&D Planning. 2003. LBNL-52047.
Weller, G.H. A Case Study Review of Technical and Technological Issues for Transition of a Utility Load Management Program to Provide System Reliability Resources in Restructured Electricity Markets. 2001.

Pages