Publications
ARRA Interconnection Planning - Load Modeling Activities. Pacific Northwest National Laboratory, 2015.
. Assessing Changes in the Reliability of the U.S. Electric Power System. 2015. LBNL-188741.
. Assessing the Value of Regulation Resources Based on Their Time Response Characteristics. Richland: Pacific Northwest National Laboratory, 2008.
. Open Access Technology International, 2019.
Assessment of Historical Transmission Schedules and Flows in the Eastern Interconnection, v1.0. Open Access Technology International, 2015.
. Assessment of Historical Transmission Schedules and Flows in the Eastern Interconnection. Open Access Technology International, 2014.
. . . Autonomous Demand Response for Primary Frequency Regulation. Pacific Northwest National Laboratory, 2012.
. Baselining Study with a Focus on Eastern Interconnection: Interim Report for Event Precursor Study. Electric Power Group, 2016.
. Behavior of Capstone and Honeywell Microturbine Generators During Load Changes. Rosemead: CERTS, 2001. LBNL-49095.
. Behavior of Two Capstone 30kW Microturbines Operating in Parallel with Impedance Between Them. CERTS, 2004. LBNL-55907.
. Best Practice Recommendations for Synchrophasor Systems: Administration, Planning and Implementation, and Operation and Maintenance. Electric Power Group, 2013.
. Building Electric Transmission Lines: A Review of Recent Regional Transmission Plans. 2016. LBNL-1006331.
. Building Electric Transmission Lines: A Review of Recent Transmission Projects. 2016. LBNL-1006330.
. A Business Case for On-Site Generation: The BD Biosciences Pharmingen Project. Berkeley: Lawrence Berkeley National Laboratory, 2003. LBNL-52759.
. . . California ISO Phasor Application Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix D). Berkeley: LBNL, 2008.
. . California ISO Real Time Voltage Security Assessment (VSA) Prototype Functional Specifications/Prototype Development (Real-Time Grid Reliability Management PIER Final Project Report Appendix C). Berkeley: LBNL, 2008.
. California ISO Real Time Voltage Security Assessment (VSA) Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix B). Berkeley: LBNL, 2008.
. California’s Electricity Generation and Transmission Interconnection Needs Under Alternative Scenarios. CERTS, 2003.
. .