California’s Electricity Generation and Transmission Interconnection Needs Under Alternative Scenarios

TitleCalifornia’s Electricity Generation and Transmission Interconnection Needs Under Alternative Scenarios
Publication TypeReport
Year of Publication2003
AuthorsVikram S Budhraja, Fred Mobasheri, Margaret Cheng, Jim Dyer, Eduyng Castaño, Stephen Hess
Series TitleConsultant Report prepared for the California Energy Commission
Pagination42
Date Published11/2003
InstitutionCERTS
KeywordsCERTS Transmission Planning, consortium for electric reliability technology solutions (certs), RTINA, transmission planning, transmission policy
Abstract

In planning for the transmission interconnections for the future, California has to look ahead 25 to 30 years to allow adequate lead time for corridor planning, transmission rights-of-way, and coordination with other states. Much of the existing interconnection system was planned 30 to 40 years ago. Transmission projects have 10-year lead-time. Generation projects are planned with a much shorter lead-time. Hence, there is no reliable information on new power plant locations to guide long range transmission planning. Yet, if California does not start the early stages of planning for the longer term, the opportunity to site needed new transmission interconnections may be lost or become prohibitively expensive, just as in the case of building new freeways or airports in population centers.